{"product_id":"12m-power-cable-for-flymo-glide-master-340-380-lawnmower-extra-long-lead-plug","title":"12m Power Cable For Flymo Glide Master 340 380 Lawnmower Extra Long Lead Plug","description":"\u003cp\u003e\u003cstrong\u003e12 Metre Power Cable For Flymo Glide Master 340 380 Lawnmower\u003c\/strong\u003e\u003cbr\u003e\u003cbr\u003eBrand new high-quality compatible replacement mains cable \u0026amp; plug for your Flymo garden appliances.\u003cbr\u003e\u003cbr\u003eSpecification: 12 metres, 2 core, 1.00mm flex, BS1363\/A Certified\u003cbr\u003e\u003cbr\u003ePlease Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.\u003cbr\u003e\u003cbr\u003e\u003cspan style=\"text-decoration: underline;\"\u003eFits models:\u003c\/span\u003e\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003eFLYMO\u003c\/strong\u003e\u003cbr\u003e\u003cbr\u003eFlymo Glide Master 340 Lawnmower \u003cbr\u003e\u003cbr\u003eFlymo Glide Master 380 Lawnmower\u003c\/p\u003e\n\u003cp\u003e**Important notice:  Appliance repairs must always be carried out by a suitably qualified engineer or technician.**\u003cbr\u003e\u003cbr\u003e**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.\u003cbr\u003e\u003cbr\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"SPARES2GO","offers":[{"title":"Default Title","offer_id":32454073385005,"sku":"22-FL-05,,,","price":17.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0322\/4263\/0701\/products\/22-FL-05_a15.jpg?v=1581418441","url":"https:\/\/spires2go.com\/products\/12m-power-cable-for-flymo-glide-master-340-380-lawnmower-extra-long-lead-plug","provider":"SPARES2GO","version":"1.0","type":"link"}